fbpx

The page your looking for has been Recycled!♻

Try our search to find what you’re looking for.

Have a read of our latest Blogs here:

Understanding the new H1/AS1 Insulation Regulations

Let's establish the situation; MBIE has proceeded with changes to the roof, window, wall, and underfloor insulation requirements by issuing the new edition of Acceptable Solution H1/AS1 and Verification Method H1/VM1 for housing and small buildings. The new insulation...

New Superslab Manual Release from Allied

You will be pleased to know Allied have updated their manual for the Codemarked READY Superslab Foundation system. This means a lot for designers and architects who are specifying the Superslab system taking advantage of the Codemark and not requiring engineer input...

QPOD™ R Value

What does R-Value mean?The thermal resistance rating or R-Value is the measure used to determine a material's ability to resist the transfer of heat. The higher the R-Value the better thermal resistance the product will provide. Around 14% of heat is typically lost...

Underfloor Heating with QPOD™ and Belle Comfort

Research has shown that New Zealand has some of the coldest houses in the world!  For this reason, Josh and his family not only planned their dream home to be beautiful but also be cosy and warm during the cold winter nights in Oamaru. Oamaru is the largest town in...

AQUACOMB | WATER STORAGE SOLUTION

What is Aquacomb? Aquacomb is an innovative detention and re-use system designed to manage rainwater and stormwater and beneficial for both residential and commercial buildings. Aquacomb is a series of interconnected water storage pods that are located within a...

Silver Hills Hawke’s Bay

Silverhills was an interesting project, 360m2 incorporating the QPOD Raft system. Engineered by Design Phase Hastings the slab was situated on a steep hill cut site with engineered retaining walls either side. Although featuring challenging contour conditions the slab...

Steiner School Project

The Steiner School Project Towards the end of 2019, the Motueka Stenier School Trust approved the build for their new Primary School. The land was purchased prior, and then they had to gain a Resource Consent before fundraising for the building then embarking on the...

Introducing Quickset Formwork

The QuickSet system provides a fully insulated foundation which includes QuickSet’s pre-finished insulated side wall panel and full blanket ground insulation providing a fully thermally broken slab. QuickSet’s form (side wall) is pre-finished in grey with a protective...