Identify your zone R. Value requirement.
Choose the foundation system that suits your design and meets the requirements for your zone.
These options incorporate the use of The Quickset Insulated formwork systems tailored to suit H1/AS1 Requirements Effective 29 November 2021
Determine QPOD Compliance to H1/AS1 through Verification.
Referencing F.1.1 ‘Methods for determining construction R-values for slab-on-ground floors this states The construction R-values for concrete slab-on-ground floors, including floors of basements that contain conditioned spaces, shall be determined using: a) The performance tables described in Section F.1.2; or b) The calculation method in Verification Method H1/VM1 Appendix F. Here we reference results based on the calculation method in Verification Method.