Apr 10, 2026 | Case Studies, News
Project Overview Client: Channel Infrastructure NZ Ltd Location: Marsden Point, Northland Foundation system: QPOD 300mm Total area: 2,051.75 m² Units installed: 4,694 × QPOD 300 pods + 1,086 extenders, 116 end caps, 1,521 spacers Structural engineer: HFC Group...
Mar 23, 2026 | Uncategorized
You Laid Better Foundations This Year If you built with QPOD in 2025, you cut landfill waste, skipped the polystyrene mess, and used smarter materials without paying more. Flip throught the report below to find out what it all added up to — project by project, slab by...
Mar 17, 2026 | Case Studies, News
Project Overview Location: Westshore, Napier Build type: Multi-unit residential (6 villas) Developer: Oniram Investments Ltd Lead Builder: TW Construction A stepped residential development comprising six villas, designed with shared access and integrated lift...
Mar 11, 2026 | Case Studies, News
Project Overview Location: King Street, Taradale, Napier As part of the continued development at Ascot Park Retirement Village in Taradale, several new villas were constructed across the site. The development involved the construction of multiple single-storey...