Case Studies

A selection of our most recent work .
Case Study: QPOD for a TC2 Site in Silver Hills, Napier

Case Study: QPOD for a TC2 Site in Silver Hills, Napier

Project Overview   Location: 79 Oak Rd, Silver Hills, Napier Builder: Davcon Construction Architectural Designer: Designgroup Stapleton Elliott (DGSE) Engineer: Kotahi Studio Set high on the Napier hillside, in the suburb of Mission Hills this new family home...

Case Study: QPOD for a TC1 Site in Havelock North

Case Study: QPOD for a TC1 Site in Havelock North

Project Overview   Location: 87 Brookvale Road, Havelock North Builder: Waipukurau Construction Architectural Designer: Blueprint Studio Concrete Supplier: Bridgeman Concrete Concrete Placing: JMC Concrete Placing Pumping & Spraying: Bird Concrete Pumping...

Case Study: QPOD for a TC2 Site in Hastings

Case Study: QPOD for a TC2 Site in Hastings

Project Overview   Location: Oliphant Rd, Hastings Architect: Spearhead Architecture QPOD Installed By: Reliable Foundations (RFL) Engineer: QPOD Engineering Team Concrete: Holcim Concrete Project Type: 231 m² – Raft Foundation System The project involved a new...

Case Study: QPOD for a TC2 Site in Napier

Case Study: QPOD for a TC2 Site in Napier

Project Overview   Location: Herrick Street, Napier Architect: Pynenburg & Collins Builder: Built Solid HB Project Manager: Rubio's Pro LTD Engineer: QPOD Engineering Team Project Type: 75 m² – polished concrete finish The client’s vision for a highly...

15 Thames St, Pandora Napier 4110 | 0800 55 33 00