Project Overview
Location: Herrick Street, Napier
Architect: Pynenburg & Collins
Builder: Built Solid HB
Project Manager: Rubio’s Pro LTD
Engineer: QPOD Engineering Team
Project Type: 75 m² – polished concrete finish
The client’s vision for a highly polished concrete floor drove the need for a precision-built foundation capable of delivering minimal movement over time. The site’s geotechnical profile, however, required careful engineering to meet seismic and settlement demands.
Site Challenges
-
Geotechnical Classification: Foundation Technical Category 2 (TC2) with moderate liquefaction vulnerability.
-
Soil Profile: Sandy silts over non-engineered fill, underlain by interbedded clays/silts/sands and medium dense sands to 5.8 m.
-
Seismic Considerations: High liquefaction risk requiring reinforcement to minimise differential settlement.
-
Architectural Requirement: A polished concrete floor with a 100 mm topping for grinding depth.
Implementation
- Subgrade Preparation: Removal of surficial topsoil and non-engineered fill, founding the slab on competent natural alluvial sediments.
- QPOD Installation: 133 closed two-side pods with interlinked spacers and end caps to match design layout.
- Reinforcement Placement: Cages installed in perimeter beams; rib reinforcement with R6 links at 120 centres through the slab.
- Insulation Layer: Continuous 50 mm XPS installed to reduce heat loss and improve R-value.
- Concrete Placement: Continuous pour for monolithic performance, followed by a 100 mm topping pour for the polished surface finish.
XPS supplied by QPOD placed under pods to boost r-value outputs
Environmental Impact
-
From a sustainability standpoint, the QPOD components installed here comprised:
- 133 closed two-side pods (11,837 plastic bottle equivalents)
- 15 end caps (105 plastic bottle equivalents)
- 93 × 100 mm spacers (279 plastic bottle equivalents)
- 185 × 300 mm spacers (1,110 plastic bottle equivalents)
- 45 × 400 mm spacers (405 plastic bottle equivalents)
Total: 13,736 bottle equivalents diverted from landfill
.
All pods are made right here onsite in Hawke’s Bay from 100% recycled materials.
Results
-
Seismic Resilience: Reinforcement strategy tailored to mitigate TC2 liquefaction effects.
-
Thermal Efficiency: XPS insulation delivering consistent under-slab performance.
-
Aesthetic Finish: Polished concrete floor to be achieved without visible cracking or surface defects.
-
Sustainability Impact: Over 13,700 recycled bottle equivalents embedded in the foundation structure.
-
Efficient Build: Modular QPOD system reduced labour time and site disturbance, and was easy to deliver and install on a tight site.