fbpx

Determine QPOD Compliance to H1/AS1

Referencing F.1.1 ‘Methods for determining construction R-values for slab-on-ground floors this states The construction R-values for concrete slab-on-ground floors, including floors of basements that contain conditioned spaces, shall be determined using: a) The performance tables described in Section F.1.2; or b) The calculation method in Verification Method H1/VM1 Appendix F. Here we will use the performance tables referenced for Raft slabs.

Click to Print my Results